// Services & Solutions

Best Services & Solutions
to Build Your Dreams

We provide optical fiber cable based telecommunication and networking solutions with the best available technologies by continuous development and enhancement of the solutions.

Optical Fiber Outside Plant (OSP) Work

A - Fiber Optic Infrastructure Route Exploration & Project Planning

Project planning and detailed field surveys are done before the construction of a new fiber optic line to prevent possible problems.

B- The Planning, Consultancy & Administration of Right of Way.

Right of way enables telecom operators to serve its customers by giving them right to cross their cables and other equipment from the inside of the boundaries of private or public lands. The use of right of way depends on the agreements of parties and solutions to fast and accurate agreements are offered by our company.

C - Technical Documentation Services

Technical documentation complete in itself from labeling to map coordinates and so on, plays the biggest role for the proper management of the network. Thus, “Technical Infrastructure are RFP/BOQ Documents” are prepared including required measurements for all kind of infrastructures in a professional manner.

D - Indoor Cabling

Indoor cabling is applied by using the best methods for the physical conditions of the buildings and needs. The number of users, channels, distribution points and the conditions in data center are determined; the deficiencies are overcome in case of necessity. Cabling is done to all planned points from the entrance of the construction.
Besides, indoor cabling for smart home systems which is shaped with the integration of developed technology and building trade is a part of our services.

E - System Control Room & Data Center Projects & Applications

From electric power systems to lighting systems, from rack cabin systems to fire sensing and fire extinguisher systems, from precision air conditioning systems to electronic security and control systems, all system control room projects and applications are provided with the use of accurate material and labor which are important for the compatibility of all components.

F - POP Points Solutions

POP points, characterized by the opening door of fiber optic technologies to end users, are implemented in a fastest way by enabling the mounting and disassembly of all active/inactive equipment with following standardized test processes.

G - Fiber Optic Infrastructure Operation & Maintenance

In addition to the preventive applications of cable cuts, with experiences coming from the past in national fiber optic infrastructures, repair process is completed much faster with respect to the companies in this industry. Besides, cable Replacement or re – routing services in are done by qualified personnel. Thus, operational efficiency and sustainability are done in top level.

H - Fusion Splicing and Optical Fiber Termination Services.

The most up-to–date equipment’s and tools must be used by following the latest technologies in fiber optic world. Personnel skills and the quality of labor are the most important criteria’s in fusion splicing and optical fiber termination services. When the new technological trends and high quality labor come together, the fastest and the highest quality of fusion splicing and optical fiber terminations in ODFs are achieved.

I - The Services of Fiber Optic Tests, Measurements & Analysis

Tests and analysis on fiber optic lines provide the persistence of efficient communication and determination of the possible breakdowns earlier. Point to Point power test is done in a detailed way by OTDR test solutions and etc.

J - The Installation Solutions of Active Transmission Equipment (FTTX)

The determination of the requirements of active equipment in data centers, system control rooms and POP points are done. The solutions for the installations of switches, routers and firewalls etc. are presented.

K - Structured Cabling

Cabling Infrastructure constitutes to the basis of network systems and wire infrastructure is the longest interface considering the whole network. That this interface is designed truest and applied provides healthy network enlargement.

While cabling infrastructure is being prepared, the subjects of the selection of appropriate cable (Single Mode or Multi – Mode Fiber Optic Cable, CAT – 5, CAT – 6, CAT – 7 data cables etc.) and the use of high quality material and labor are important issues. Likewise, that constituted infrastructure is tested in proper standards and the documentation is done in a correct way enable infrastructure production convenient to determined technical standards.

L - Audit/Supervision For Fiber Optic Lines.

Compatibility to national – international standards and agreements for completed constructions of fiber optic infrastructures are important for long term use. Compatibility is examined and the result is reported. Required regulation operations are done if it is needed.